Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 亚洲国产av男人的 | 欧美国产日本精品一区二区三区 | 字幕无码日韩专区免费 | 无码熟妇人妻av在线网站 | 国产精品永久免费视频 | 麻豆一区二区三区蜜桃 | 国产黄网免费视频在线观看 | 日韩免费精品无码一二三区 | 亚洲成av人片在线观看无码 | 欧美激情亚洲激情 | 激情韩国无码一区二区一卡 | 最新日韩剧 | 99国产在线精品国自产在 | 国产av无码福利精品成人久久 | 欧美成人亚洲综合精品欧美激 | 97国产婷婷综合视 | 99久久香蕉国产线看观香 | 日本少妇高潮喷水xxxxxxx | 午夜黄色视频在线 | 国产午夜精品18 | 人妻aⅴ中文字幕无码 | 亚洲日韩欧美每日在 | 日本高清免费一级啪啪大片 | 91精品久久久久久久久入口 | 91黑料精品国产 | 亚洲日韩欧美一区二区三区 | 成人夜色视频网站在线观看 | 久久高清国产视频 | 国产午夜免费的av | 香蕉欧美成人精品a∨在线观看 | 91在线视频播放 | 国产精品久久久久久福利69堂 | 欧美久久一级内射wwwwww. | 欧美交换配乱吟粗大25p | 少妇高潮免费毛片 | av中文无码乱人伦在线观看 | 91尤物视频在线观看 | 亚洲av成人波多野一区二区三区 | 色综合久久综合久鬼88 | 日韩欧美一级性视频 | 国产免费一级高清淫曰本片 |